Entry Details
Organization: | Atkinsrealis |
Login ID: | Mohamed Fathy |
Category applied for: | HVAC CONSULTING ENGINEER OF THE YEAR |
Submission date: | 12-Aug-2024 |
Submission Entry: | 1.) Given that buildings consume 40% of global energy, within which at least 40% is consumed by HVAC systems, how has the goal of 1.5 C additionally impacted your design development strategies? What specific design or equipment/controls selection changes have you incorporated (or suggested) in your designs in order to support the 1.5 goal? (150 words) (311)Answer: 1 2.) Describe what building performance indicators would you like to study or observe, if given an opportunity to visit a project you worked on, as part of a team or as an individual consultant. And why? (This is beyond the Defects Liability Period and could span the lifetime of the project.) (200 words) (312)Answer: Building performance indications: 3.) In the past one year, how have you applied AI/IoT in projects you are given an opportunity to work on? What technological initiatives have you brought to bear as an individual and as a member of a team of engineering consultants? (150 words) (313)Answer: No 4.) In the past one year, what percentage of your design projects have secured a Green Building certification? And under which rating systems and at what levels of certification? (100 words) (314)Answer: Royal Equestrian & Polo Club at Wadi Saffar - LEED Platinum 5.) In the past one year, how much carbon emission reduction has been achieved by the projects that you have designed, or been a substantial part of? (100 words) (315)Answer: Najdi Residential districts Diriyah - LEED Platinum 6.) Anything else you wish to say, which you feel would bolster your case? (150 words) (316)Answer: In 2014 in the project of King Faysal medical city with Capacity of 1350 Beds, we apply the heat recovery chillers to eliminate the boiler required for VAV reheat coil |
Supporting documents: | none |
References: | CCAKSA24-HVCE || Mohamed.Fathy@atkinsrealis.com |